EasyManua.ls Logo

GE Senographe DS

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A011 - Trackball Option Installation
Page no. 449 Chapter 6
JC-PHY-A-011.fm
computer. Secure the Trackball and USB extension cable connectors with two cable ties (19).
20. Ensure that the monitor cables have sufficient slack (20) within the Control Station so that they can
move. This ensures that the movement of the monitor cables are not inhibited when the rotative arm
is turned. Secure the harness to the monitor cables and trackball cable with a cable tie at 1 cm from
the end of the harness (21). Secure the monitor cables and trackball cable to the Control Station
framework with a cable tie (22).
19
20
21
22

Table of Contents

Other manuals for GE Senographe DS

Related product manuals