EasyManuals Logo

GE Senographe DS User Manual

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #472 background imageLoading...
Page #472 background image
Chapter 6 Page no. 472
JC-PHY-A-016.fm
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A016 - AC Connection
6-4 Configure Fuses F1, F2.
To configure these fuses (see illustration 2 for location), follow the indications on the label located on the
bottom of the Generator cabinet, just below the AC supply switch S1.
WARNING
For safe operation of the Senographe, pay particular attention to the information on this
label.
Determine whether the AC supply consists of two phases (phase/phase), or a single phase
and neutral (phase/neutral).
When the supply is single–phase with neutral (phase/neutral), a metal cylinder (delivered
with the system) must be installed instead of F1.
ILLUSTRATION 1 - LOCATION OF FUSES
F1

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals