GE Analytical Instruments ©2016 164 of 270 DLM 68100-09 EN Rev. A
Chapter 6: Analyzer Operation
The leak sensor for the Analyzer’s main enclosure is now activated. Continue the remaining steps in this
procedure ONLY if the Analyzer is installed inside an additional Hazardous Location enclosure (ATEX or
C1/D2)].
6. If the Analyzer is installed inside an additional Hazardous Location enclosure (ATEX or C1/D2), verify that
the Analyzer has a liquid sensor (see Figure 65
) installed on the lower-left inside wall of the enclosure. (If
you are unsure of the presence of a liquid sensor, do NOT enable this feature.)
7. Select the I/O tab.
8. Press the Liquid Sensor Setup button. The Main Enclosure Liquid Sensor and Auxiliary Enclosure
Liquid Sensor buttons appear.
9. Press the Auxiliary Enclosure Liquid Sensor button and press the Enabled button.
10. Verify that the Auxiliary Enclosure Liquid Sensor button now shows an Enabled state.
The leak sensor for the auxiliary Hazardous Location enclosure is now activated.
Figure 64: Liquid Sensor Location — Analyzer Enclosure
Figure 65: Liquid Sensor Location — Hazardous Location Enclosure (ATEX or C1/D2)