EasyManua.ls Logo

GE Sievers Innovox - Step 6: Install Input;Output, Cables, and Accessories

GE Sievers Innovox
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2016 79 of 270 DLM 68100-09 EN Rev. A
Chapter 4: Installation
Step 5: Fill the Gas-Liquid Separator
Refer to Figure 6: The Gas-Liquid Separator, as needed.
1. Open the door of the Analyzer.
2. Disconnect the tube from the top barb on the left side of the gas-liquid separator (the barb marked
“NDIR Filter”). See Figure 6:
The Gas-Liquid Separator.
3. Fill the squeeze bottle with deionized (DI) water or the best-quality water available.
4. Use the squeeze bottle to fill the gas-liquid separator through the center top barb until the center clear
tube of the gas-liquid separator is filled with water.
5. Reconnect the tube to the barb.
Figure 6: The Gas-Liquid Separator
Step 6: Install Input/Output, Cables, and Accessories
The Analyzer's Input/Output (I/O) board is located in the top of the Analyzer under the access cover. Remove the
cover. There are four terminal blocks on the I/O board, with TB1 located closest to the front of the Analyzer. From
front to rear the other terminal blocks are TB2, TB3, and TB4. Consult the tables in this section for a list of
NOTE:
Before installing any wiring inside the Analyzer, put on a grounding strap for ESD protection.
.

Table of Contents

Related product manuals