EasyManua.ls Logo

GE Sievers Innovox - Figure 25 Overflow Method - External Sample Pump Position; Figure 26 Overflow Method - Barb Fittings Identification

GE Sievers Innovox
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2016 96 of 270 DLM 68100-09 EN Rev. A
Chapter 4: Installation
Figure 25: Overflow Method — External Sample Pump Position
3. Connect the sample to the peristaltic pump. Refer, as needed, to Installing the Online Sample System
on page 89.
4. Locate a Wastewater Sampler pipe assembly and a small-size barbed fitting for each of the streams
you are installing.
Figure 26: Overflow Method — Barb Fittings Identification
5. For Overflow method, install a small-size barb into the open end of the sample inlet pipe. This is the pipe
with the internal sipper tube (needle).
6. Locate the filter vents located in the Wastewater Sampler Kit.
NOTE:
Leave the pre-installed barb inside the other pipe (the pipe without the internal sipper tube).
Small-size Barb Fitting Large-size Barb Fitting

Table of Contents

Related product manuals