GE Analytical Instruments ©2016 171 of 270 DLM 68100-09 EN Rev. A
Chapter 6: Analyzer Operation
To resume Analyzer Operation
When you are ready to resume operation after shutting down the Analyzer, follow these steps:
1. Ensure that AC power is connected and the power switch is in the On position.
2. Press the touchscreen to start the Analyzer.
Checking the Software Version
You can view the software version of the Analyzer for your reference or to aid in troubleshooting activities.
To check to the software version
1. Select the Maintenance tab.
2. Press the Software Version button.
The main software version appears on top. (This is the same version number that displays when the
Analyzer starts up.) The embedded software versions of the different modules in the Analyzer also
appear.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Sievers Innovox and is the answer not in the manual?

GE Sievers Innovox Specifications

General IconGeneral
BrandGE
ModelSievers Innovox
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals