Initial operation
Put the control device into operation
3
1009.25B0
IFU 1009.25 EN 01
19 / 92
3 Initial operation
3.1 Put the control device into operation
NOTE
The battery is not fully charged when the control device is delivered. The battery
must be fully charged before initial operation.
NOTE
In order to be able to attribute possible error messages to a certain time, the date
and time must be set. The set date and time are displayed in the System
information menu.
1. Fully charge the control device [8Page19].
Ø The control device is activated.
Ø The control device is charged.
2. Set the date and time [8Page40].
3.2 Charge the control device
NOTE
The charging time for a fully discharged battery is approx. 6 hours.
The control device can be used with the following products:
• Stationary charging station (1009.24A0)
for connection to the AC mains 100–240 V AC
• Mobile charging station (1009.24B0)
for connection to the AC mains 100–240 V AC
• Stationary charging station (1009.24C0)
for connection to the 24 V DC mains
• Cable (1009.27A0)
for connecting to the OTESUS 1160.01, MEERA CL 7000.01, MEERA ST 7100.01, MEERA
7200.01, CORIN 7700.01 operating tables
The mobile charger/the stationary charging station have several functions:
• Safe storage of the control device
• Charging the control device
• Automatic unlocking of the activated sleep mode [8Page41]