EasyManua.ls Logo

IAI X-SEL

IAI X-SEL
535 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
106
INTELLIGENT ACTUATOR
Part 1 Installation
(8) When the replacement of system-memory backup battery is complete, confirm that the battery is
installed securely and then turn on the controller power.
(9) Revert “Other parameter No. 20, Backup-battery installation function type” to the value recorded in
step 2, transfer the setting to the controller, and then perform a flash ROM write.
* Confirm that the flash ROM writing process has completed.
(10) Perform a software reset (restart the controller).
(Note) Commencing the operation without first executing a software reset or reconnecting the power
may generate the following errors:
Error No. C70: ABS coordinate non-confirmation error
Error No. C6F: Home-return incomplete error
(11) When the controller has been restarted, confirm that the SRAM data have been restored.

Table of Contents

Other manuals for IAI X-SEL

Related product manuals