Table 52: Switch Fabric Board Removal Alarm Times
(Connued)
Line Card Type Ambient Temperature (°C) Trac (%) Duraon
MX10K-LC2101 33 100% 3 min 28 sec
40 100%
2 min 4 sec
MX10K-LC480 40 100%
6 min
Ensure that you have the following equipment before you install an SFB:
• Anstac bag or anstac mat
• Electrostac discharge (ESD) grounding strap
• Phillips (+) number 2 screwdriver (oponal)
• Replacement SFB
To install an MX10004 Switch Fabric Board:
1. Place an anstac bag or an anstac mat on a at, stable surface.
2. Wrap and fasten one end of the ESD grounding strap around your bare wrist and connect the other
end of the strap to an ESD point on the chassis. An ESD point is located next to the protecve
176