5.2011.8583.0 C
Troubleshooting 7-29
2. Make sure the grabber is still open for 60 - 65%.
3. Go to the page Testing > Test Lift Motor.
4. Push the button
UP to lift the grabber all the way up.
5. Put the Feed Grabber in operation (see procedure).
6. If present, put the Bridge Crane in operation (see procedure).
7. Switch on the Mixing and Feeding Robot with the Key (see procedure), if present switch on the second
Mixing and Feeding Robot.
in n o vato rs in agriculture