Rack Front
Figure 52. Removing the server from the rack.
a. 
Press the release tabs to disengage the rails from the server.
b. 
Carefully lift up the front end of the server slightly to detach the nailheads from the slots on 
the rails.
c. 
With three people, lift up the serve to remove it from the rails completely. Place the server 
on a flat and sturdy surface.
After you finish 
Carefully lay the server on a flat, static-protective surface.
Install the server to rack
Follow instructions in this section to install the server to the rack.
S036 
18 - 32 kg (39 - 70 lb) 32 - 55 kg (70 - 121 lb)
CAUTION: 
Use safe practices when lifting.
S006 
CAUTION: 
94
ThinkSystem SR635 V3 User Guide