About this task
Attention:
• Read
“Installation Guidelines” on page 45 and “Safety inspection checklist” on page 46 to ensure that you
work safely.
• Power off the server and disconnect all power cords for this task.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
Procedure
Step 1. If the security bezel is installed, remove it first. See
“Remove the security bezel” on page 183.
Step 2. Locate the EDSFF cage you need to remove, and then remove all the EDSFF drives installed in it.
See
“Remove a hot-swap EDSFF drive” on page 102.
Step 3. Remove the EDSFF cage from the chassis.
Figure 34. EDSFF cage removal
a.
Press down the extended tab on the other side of the front chassis.
b.
Slide the EDSFF cage out of the front chassis.
After you finish
1. Install a new EDSFF cage. See
“Install an EDSFF cage” on page 76.
2. If you are instructed to return the old EDSFF cage, follow all packaging instructions and use any
packaging materials provided.
Install an EDSFF cage
Use this information to install an EDSFF cage.
About this task
76 ThinkSystem SR635 V3 User Guide