•  Power off the server and disconnect all power cords for this task.
•  Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static- 
sensitive components in their static-protective packages until installation, and handling these devices with 
an electrostatic-discharge wrist strap or other grounding system.
Watch the procedure 
A video of this procedure is available at YouTube: 
https://www.youtube.com/playlist?list=PLYV5R7hVcs- 
DrpxDWLMfgtXO4O6BVYTim
. 
Procedure
Step 1.  Remove the top cover. See “Remove the top cover” on page 212.
Step 2.  Remove any components that may impede access to the internal CFF HBA/RAID adapter.
Step 3.  Disconnect all cables from the internal CFF HBA/RAID adapter. See 
“CFF RAID/HBA adapter” on 
page 222
and Chapter 6 “Internal cable routing” on page 217.
Step 4.  Lift the release pin, slightly slide the internal CFF HBA/RAID adapter as shown, and carefully lift it 
out of the chassis. 
Figure 70. Internal CFF HBA/RAID adapter removal
After you finish
If you are instructed to return the old internal CFF HBA/RAID adapter, follow all packaging instructions and 
use any packaging materials that are provided.
Install the internal CFF HBA/RAID adapter
Use this information to install the internal CFF HBA/RAID adapter.
About this task
Attention: 
•  Read 
“Installation Guidelines” on page 45 and “Safety inspection checklist” on page 46 to ensure that you 
work safely.
Chapter 5. Hardware replacement procedures 111