EasyManua.ls Logo

Lenovo ThinkSystem SR650 V3 7D75 - Rearwall Bracket Replacement

Lenovo ThinkSystem SR650 V3 7D75
518 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 174. Installing the RAID flash power module
a. Put a RAID flash power module into the holder, and press it down to secure it into the
holder.
b.
Align the holes in the metal cover with the pins on the supercap holder, pull out the blue
latch on the cover, and slide the cover into the holder until the pins pass through the holes.
Then, release the blue latch to lock the cover into place.
Step 3. Install the rubber onto the cover of the supercap holder.
Figure 175. Rubber installation
Step 4. Connect the RAID flash power module to an adapter with the extension cable that comes with the
RAID flash power module. See
Chapter 6 “Internal cable routing” on page 271.
After you finish
Complete the parts replacement. See
“Complete the parts replacement” on page 269.
Rearwall bracket replacement
Use this information to remove and install a rearwall bracket.
The rearwall brackets vary by server rear configurations. This topic uses the A1, B1, and C1 brackets as an
example for replacement illustration. The replacement procedure is the same for B2 and C2 brackets.
“Remove a rearwall bracket” on page 209
“Install a rearwall bracket” on page 211
Chapter 5. Hardware replacement procedures 207

Table of Contents

Related product manuals