When the input power is blocked, it charges the DC
link with regenerated energy. When the input power
is restored, it restores normal operation from the
energy buffering operation to the frequency
reference operation. KEB Acc Time in Cn- 83 is
applied as the operation frequency acceleration time
when restoring to the normal operation.
When the input power is blocked, it charges the DC
link with regenerated energy. When the input power
is restored, it changes from the energy buffering
operation to the deceleration stop operation. The
Dec Time in dr-04 is applied as the operation
frequency deceleration time during the deceleration
stop operation.