EasyManuals Logo

Manitowoc 2250 User Manual

Manitowoc 2250
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #289 background imageLoading...
Page #289 background image
Reference Only
Manitowoc Published 06-24-16, Control # 241-01 4-127
2250 OPERATOR MANUAL SETUP AND INSTALLATION
4
WARNING
Tipping Hazard!
Prevent the possibility of being crushed or seriously
injured. Exercise care when the load block is standing in
the vertical position, since the potential for tipping exists.
Potential causes of tipping are unstable work area, boom
movement, and the reeving process. If work area is
unstable, lay the block flat on the side plate.
FIGURE 4-72
2 PART
3 PART
4 PART
Dead End Here
for 3 Parts
Load Block
Fixed
Jib Point
Universal Anchor
Joint (1)
Dead End Here
for 2 or 4 Parts
The universal anchor joint (1) must be removed
when 2-or-4-part line is dead ended at upper
dead end lug or when 3-part line is used
Jib
Point
Load
Block
Load-
Sensing
Sheaves
STANDARD LIFTCRANE
#132 Fixed Jib

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals