EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK7450

Manitowoc GROVE GMK7450 User Manual

Manitowoc GROVE GMK7450
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #250 background imageLoading...
Page #250 background image
Maintenance work on the superstructure
8.6 Hoists
8 - 48 3 302 577 en Maintenance manual
GMK7450
16.08.2018
8.6.6 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
brake,
–
the plug connections between the multiple-disk brake and transmission
unit
and be permitted to replace parts with signs of wear.
8.6.7 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the
information contained in
Measures required for winch monitoring, p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examine
d.
H
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1,000 operating hours;
à Run-in regula-
tions
, P. 4 - 1.
Y 3
Y 6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK7450 and is the answer not in the manual?

Manitowoc GROVE GMK7450 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK7450
CategoryConstruction Equipment
LanguageEnglish

Related product manuals