EasyManuals Logo

Manitowoc GROVE GMK7450 User Manual

Manitowoc GROVE GMK7450
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #164 background imageLoading...
Page #164 background image
Maintenance work on the carrier
7.14 Hydraulic system
7 - 92 3 302 577 en Maintenance manual
GMK7450
16.08.2018
7.14.6 Taking oil samples
Reducing the
interval
• Under difficult operating conditions – at tropical or very hot locations –
you must halve the oil change interval.
Spare parts and
tools
– A hose with a connecting piece for a gauge port.
– A sample container 0.3 litres (0.08 gal).
– Receptacle, approx. 5 l (1.5 gal);
à P. 2 - 4.
Prerequisites – During the oil test the engine must be switched off and be secured against
unauthorised use;
à P. 2 - 3.
Select the sam-
pling location
To determine the usability of the oil, you must take a sample from the
hydraulic system. To do tha
t you must connect the hose with the connecting
piece to a gauge port.
The gauge port (1) is located on the cylinder of
the outrigger.
• Clean the gauge port before connecting the
hose.
M 12
Hose lengths GROVE part no.
1 m (3.3 ft) 01923003
2 m (6.6 ft) 00551941
4 m (13.2 ft) 01923139
GROVE part no.
One set of sample containers
with a protective mailing ba
g and delivery note
to the contracted laboratory
03141012

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK7450 and is the answer not in the manual?

Manitowoc GROVE GMK7450 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK7450
CategoryConstruction Equipment
LanguageEnglish

Related product manuals