Installation 13
_______________________________________________________________________________________________
_______________________________________________________________________________________________
MICROPLEX Operator’s Manual SOLID F90 HD Edition 1.0
2. Installation
2.1. Check List
First, place the printer and the accessories onto a level surface until
the definitive location is chosen.
Please make sure that all items are included and that there are no
defects. Immediately inform your supplier of any damage.
Open the cardboard box carefully and check the contents:
1. MICROPLEX Printer SOLID F90 HD
2. Developer Unit
3. Developer (powder)
4. Toner
5. Photoreceptor Drum
6. Cleaning Unit
7. Stacker
8. CD containing:
• Operator’s Manual SOLID F90 HD
• Print drivers
• IDOL Programming Manual
!
The printer’s first installation has to be done by a trained service
engineer.
!
Please retain the original packing materials in case the printer has
to be transported in the future.
Use the original packing materials and adhesive fasteners to avoid
damage to the internal components.
(See chapter 9 Measures for Transport and Shipping (Repacking)).