EasyManuals Logo

Mindray A5 Operating Instructions

Mindray A5
310 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #128 background imageLoading...
Page #128 background image
Breathing System Tests Preoperative Tests
4 - 24 046-003777-00 A5/A3â„¢ Operating Instructions
4.13 Breathing System Tests
WARNING: Objects in the breathing system can stop gas flow to the patient. This
can cause injury or death. Ensure that there are no test plugs or other
objects in the breathing system.
WARNING: Do not use a test plug that is small enough to fall into the breathing
system.
1. Ensure that the breathing system is correctly connected and not damaged.
2. Ensure that the check valves in the breathing system work correctly:
a. The inspiratory check valve opens during inspiration and closes at the start of expiration.
b. The expiratory check valve opens during expiration and closes at the start of inspiration.
4.13.1 Bellows Test
1. Select the End Case button in the Manual tab.
2. Follow the screen prompts to end the case and enter Standby mode.
3. Set the Auto/Manual ventilation switch to Auto.
4. Set all flow controls to Off.
5. Close the breathing system at the patient connection by connecting the Y-piece on the
breathing circuit to the leak test port.
6. Push the O
2
flush button to expand the bellows to the top of the bellows enclosure.
7. Ensure that the pressure does not increase to more than 15 cmH
2
O on the airway pressure
gauge.
8. The bellows should not fall faster than a rate of approximately 300 ml/min. If the leak rate is
greater, troubleshoot the source of the leak. If the source of the leak is the bellows, then the
bellows must be replaced.
4.13.2 Breathing System Leak Test in Manual Ventilation Status
1. Set the Auto/Manual ventilation switch to Manual.
2. Adjust all flowmeters to zero.
3. Select the End Case button in the Manual tab.
4. Follow the screen prompts to end the case and enter Standby mode.
5. Connect the manual bag to the manual bag port.
6. Turn the APL valve control to fully close the APL valve (75 cmH
2
O).
7. Turn the O
2
flow control to set the O
2
flow to 0.15 L/min.
8. Connect the Y-piece on the breathing circuit to the leak test port.
9. Push the O
2
flush button to let the pressure increase to approximately 30 cmH
2
O on the
airway pressure gauge.
10. Release the flush button. A pressure decrease on the airway pressure gauge indicates a leak.
Contact your service personnel.

Table of Contents

Other manuals for Mindray A5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mindray A5 and is the answer not in the manual?

Mindray A5 Specifications

General IconGeneral
TypeAnesthesia Machine
BrandMindray
ModelA5
Power Supply100-240 V AC, 50/60 Hz
Ventilation ModesSIMV, PSV
FlowmetersO2, N2O, Air
Vaporizer CapacityUp to 3 vaporizers
Safety FeaturesO2 failure protection, low pressure alarm
Gas ModuleOptional integrated gas module
Integrated Air CompressorOptional
Patient MonitoringIntegrated monitoring with optional modules

Related product manuals