EasyManua.ls Logo

Mitsubishi GOT1000 GT15 - Page 157

Mitsubishi GOT1000 GT15
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.1 Communication Unit
8.1.2 Installing procedure
8 - 11
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
PART NAME AND
SETTINGS
5
EMC AND LOW
VOLTAGE
DIRECTIVE
6
INSTALLATION
7
WIRING
8
OPTION
6 Mount the network unit (A9GT-QJ71LP23 or A9GT-QJ71BR13) or CC-Link communication unit (A8GT-
J61BT13) to GT15-75IF900.
7 Fasten the unit fixing brackets (3 places) with tightening torque of 0.36 to 0.48N·m.
4 MELSECNET/H communication unit, CC-Link IE Controller Network communication
unit, CC-Link IE Field Network communication unit, CC-Link communication unit
(GT15-J61B13)
(1) Unit installation
1 Power OFF the GOT.
2 Remove the two extension unit covers of the GOT rear face.

Table of Contents

Related product manuals