8.1 Communication Unit
8.1.2 Installing procedure
8 - 11
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
PART NAME AND
SETTINGS
5
EMC AND LOW
VOLTAGE
DIRECTIVE
6
INSTALLATION
7
WIRING
8
OPTION
6 Mount the network unit (A9GT-QJ71LP23 or A9GT-QJ71BR13) or CC-Link communication unit (A8GT-
J61BT13) to GT15-75IF900.
7 Fasten the unit fixing brackets (3 places) with tightening torque of 0.36 to 0.48N·m.
4 MELSECNET/H communication unit, CC-Link IE Controller Network communication
unit, CC-Link IE Field Network communication unit, CC-Link communication unit
(GT15-J61B13)
(1) Unit installation
1 Power OFF the GOT.
2 Remove the two extension unit covers of the GOT rear face.