EasyManua.ls Logo

Mitsubishi GOT1000 GT15 - Page 158

Mitsubishi GOT1000 GT15
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 - 12
8.1 Communication Unit
8.1.2 Installing procedure
5 After the installation, tighten the mounting screws (4 places) in the specified torque range (0.36
to 0.48N·m).
3 Install the extend interface relay board on the Extend I/F-2 side of the GOT.
After the installation, detach the connector cover from the extend interface relay board.
For GT155 , the extension interface relay board is not needed.
Remove the connector cover
4 Install the communication unit on the extension interface of the GOT rear face.
(When the extension unit is installed in GOT, remove the installed extension unit. And, do not
touch the board in the GOT when install the communication unit.)

Table of Contents

Related product manuals