EasyManua.ls Logo

Perkins 103-13 - Page 61

Perkins 103-13
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Workshop Manual, TPD 1377E, issue 4 51
100 Series
To fit Operation 4-3
Special requirements
For positioning of connecting rod assembly refer to Operation 4-2.
Note: Pistons must be fitted with Shibaura name toward the fuel injection pump.
Torque Nm (lbf ft) kgf m
102-05, 103-07 23 (17) 2,3
103-13, 103-15, 104-19, 104-22 52 (38) 5,3
103-10 32 (24) 3,2
This document has been printed from SPI². Not for Resale

Table of Contents

Related product manuals