EasyManua.ls Logo

RED CAT TEAL 2 - 17 Field Maintenance & Schedule; Field Replaceable Parts; Maintenance Schedule; As Needed

Default Icon
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
101
17 FIELD MAINTENANCE & SCHEDULE
17.1 FIELD REPLACEABLE PARTS
Field replaceable parts are easily replaced in the field. Use the tools provided in the Field
Spares Kit to replace and repair parts.
This manual does not cover repairs, upgrades, or software updates that cannot be
performed in the field. Attempting repairs, upgrades, or software updates not covered in
this manual may void conditions and terms of the warranty.
17.2 MAINTENANCE SCHEDULE
17.2.1 AS NEEDED
1. Clear and format the SD Card media.
2. Clean all sensors and the AV with a damp cloth and a can of air.
3. Fully discharge all batteries and charge back to full capacity.
4. Verify the gimbal and camera connectors are securely seated.
5. Update the AV and the GCS software.
6. Delete and re-download offline maps to get latest versions.
7. Clear flight logs from the AV.
17.2.2 AFTER SPECIFIC PERIODS
1. Replace propellers every 10 hours of flight.
2. Replace arms every 10 hours of flight.
3. Retire battery pack after 150 charge/discharge cycles.
17.3 ROTOR ARM REPLACEMENT
Replace the entire arm when the rotor arms are damaged or worn. The spare arms are
prewired with the motor installed and only need to be locked into place and secured with
a single Torx T8 screw per arm. The Torx T8 screwdriver is included in the Field Repair Kit.
Use the included Torx T8 screwdriver to replace the arms.
Arms are keyed as clockwise (CW) and counter clockwise (CCW) on the airframe. The CW
and CCW arms are not interchangeable.

Table of Contents