Chapter 6 Maintenance and Inspection
Mobile DaRt Operation Manual
6-4
Tube arm
Immediately contact your nearest authorized Shimadzu service
center when the arm connection part shakes.
Whether the M6 bolts in four places loosen
Immediately contact your nearest authorized Shimadzu service
center when there is shaking in the movement before and behind
the arm is loose.
There is a possibility that the M5 bolts in five places in which the rail
under an inside arm is installed.
Confirm whether the bolts in three places loosen when the arm is
extended to the maximum.
Arm connection part
M5 bolts (five places)
The bolts in two places are hidden by the cover.