EasyManua.ls Logo

SICK FLOWSIC500

SICK FLOWSIC500
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
112 FLOWSIC500 · Operating Instructions · 8025733/1GMJ/V4-2/2022-07 · © SICK Engineering GmbH
Maintenance and meter exchange
Subject to change without notice
Fig. 50 Battery connections on the circuit board
4 Remove the battery pack and replace by the new one.
5 Reconnect the electrical system.
The FLOWSIC500 now continues to use the second battery pack and then switches
back to the new battery pack.
6 Close the electronics cover ( p. 48, §3.4.3)
7 Confirm battery replacement on the display ( p. 99, §5.2.13).
8 Alternatively, confirm battery replacement with the FLOWgate
TM
operating software:
Connect to device, p. 71, §4.3.1.
Login as “Authorized User” on the device.
Open the tile “System/User” in the “Parameter Modification” area.
Start the configuration mode.
When the battery pack on “BAT2” has been exchanged, click “Battery change Source
2” in area “Power supply”.
When the battery pack on “BAT1” has been exchanged, click “Battery change Source
1” in area “Power supply”.
9 Return to the operating mode.
NOTICE:
The battery symbol on the display shows full straight away after the battery
change.
The check whether the battery is really operational then takes 20 minutes.

Table of Contents

Related product manuals