Finishing Up
This chapter describes tasks to perform after replacing components within the server.
Topics include:
Section 6.1, “Tasks for Finishing Up” on page 6-1
6.1 Tasks for Finishing Up
After replacing components inside of the server, perform the following tasks:
Section 6.1.1, “Installing the PCI Mezzanine” on page 6-1
If it was removed for the component replacement procedure.
Section 6.1.2, “Installing the Top Cover” on page 6-3
Section 6.1.3, “Removing Antistatic Measures” on page 6-4
Section 6.1.4, “Reinstalling the Server Chassis in the Rack” on page 6-5
Section 6.1.5, “Reconnecting Cables to the Server” on page 6-7
Section 6.1.6, “Powering On the Server” on page 6-8
Note When replacing the hard drives or power supplies, not all of these tasks are
necessary. The replacement procedures for those components address this fact.
6.1.1 Installing the PCI Mezzanine
1. Position the PCI mezzanine onto the chassis.
2. Lower the PCI mezzanine and slide it toward fron of server (
FIGURE 6-1).