29
Preparing for Service
These sections describe safety considerations and provide prerequisite procedures
and information to replace components within the server.
Related Information
■ “Returning the Server to Operation” on page 143
Safety Precautions
For your protection, observe the following safety precautions when setting up your
equipment:
■ Follow all standard cautions, warnings, and instructions marked on the
equipment and described in the online Sun Server X4-2 Safety and Compliance Guide
and in the printed Important Safety Information for Oracle’s Hardware Systems.
■ Ensure that the voltage and frequency of your power source match the voltage
and frequency inscribed on the equipment’s electrical rating label.
■ Follow the electrostatic discharge safety practices as described in “Electrostatic
Discharge Safety” on page 31.
Description Links
Understand the safety precautions,
understand the server FRU top-level
indicator, understand the safety symbols,
and take ESD precautions prior to
removing or installing parts in the server.
“Safety Precautions” on page 29
“FRU TLI Auto-Update” on page 30
“Safety Symbols” on page 30
“Electrostatic Discharge Safety” on page 31
Assemble the required tools. “Required Tools” on page 32
Before working with components within
the server, power down the server and
prepare for servicing.
“Preparing the Server for Component
Replacement” on page 33