148 Sun Server X4-2 Service Manual • May 2014
▼ Return the Server to the Normal Rack
Position
If the server is in the extended maintenance position, use this procedure to return the
server to the normal rack position.
1. Push the server back into the rack, as described in the following steps.
a. Simultaneously pull and hold the two green release tabs (one on each side of
of the server) toward the front of the server (see the following figure) while
you push the server into the rack.
As you push the server into the rack, verify that the cable management arm
(CMA) retracts without binding.
Note – To pull a green release tab, place your finger in the center of the tab, not on
the end, and apply pressure as you pull the tab toward the front of the server.