CAUTION! PHYSICAL INJURY HAZARD. Do not aempt to lift the
instrument or any other heavy objects unless you have received related
training. Incorrect lifting can cause painful and sometimes permanent back
injury. Use proper lifting techniques when lifting or moving the instrument. At
least two people are required to lift it.
IMPORTANT! Moving your instrument can create subtle changes in the alignment of
the instrument optics. Recalibrate the instrument if necessary.
• Ensure that the surface on which you place the instrument can support at least
35 kg (77 lbs).
• Ensure that the path to transport the instrument is clear of obstructions.
• At least two people are needed to lift and carry the instrument.
• Keep your spine in a good neutral position.
• Bend at the knees and lift with your legs.
• Do not lift an object and twist your torso at the same time.
• Coordinate your intentions with your assistant before lifting and carrying.
IMPORTANT! After moving the instrument, perform an RNase P instrument
verication run. If the run fails, perform ROI/ uniformity, background, and dye
calibrations.
The service process requires 2 to 3 weeks.
Before returning the instrument for service, perform the following tasks.
1. Back up the instrument (see “Backup or restore the instrument“ on page 70).
2. In the home screen, touch Seings4Instrument Seings4Reset Factory
defaults.
3. Set the instrument to Ship Prep Mode (see “Prepare the instrument to store,
move, or ship“ on page 74).
To return the instrument for service, perform the following tasks.
1.
Contact your local customer care center or technical support group to obtain a
copy of the Certicate of Instrument Decontamination, a service notication, a
service call number, and packaging materials (if required).
2.
Follow the instructions in the form to decontaminate the instrument.
IMPORTANT! The instrument must be decontaminated before packing it for
shipping.
3.
Complete and sign a copy of the Certicate of Instrument Decontamination.
4.
Fax the Certicate of Instrument Decontamination to the customer care center.
Move the
instrument
Return the
instrument for
service
Chapter 6 Maintain the instrument
Prepare the instrument to store, move, or ship
6
QuantStudio
™
1 Real-Time PCR System Installation, Use, and Maintenance Guide
75