Maintenance
Group1
Winterthur Gas & Diesel Ltd.
1/ 2
Bedplate and Tie Rod Group 1
Bedplate and Thrust Bearing: Checking the Foundation Bolts 1112−1/A1..............................
Main Bearing
Loosening and Tensioning of Elastic Studs 1132−1/A1..............................................
Main Bearing − Removal and Installation 1132−2/A1................................................
Main Bearing Removal and Installation 1132−2/A2.................................................
Thrust Bearing
Axial Clearance Checks 1203−1/A1..............................................................
Thrust Bearing Pads − Removal and Installation 1224−1/A1.........................................
Engine Stays with Friction Shims: Pre-tension Checks 1715−1/A1....................................
Hydraulic Engine Stays: Oil Pressure Checks 1715−1/A2.............................................
Tie Rod: Pre-tension Checks and Tie Rod Replacement 1903−1/A1....................................