Camshaft and Bearing Shells Removal and Installation
Tools:
2 Pre-tensioning jack 94557 1 Screwjack 94567B
3 Support 94566 1 Connection block 94934
1 Support 94566A 1 Pressure gauges 94934A
6 Roller lifting tool 94569B 3 HP hoses 94935
1 Assembly template 94567 1 Hydraulic unit 94942
1 Assembly template 94567A
1. Preparation 1.......................................................
2. Bearing Shells Removal 3.........................................
3. Camshaft Removal 4..............................................
4. Camshaft and Bearing Shells Installation 4.........................
5. Completion 6.......................................................
1. Preparation
1) Remove the covers (2, Fig. 1) from the casing (3).
2) Remove the fuel pumps (1) refer to 55561, or as an alternative lift the rollers (see
step 3) to step 4).