EasyManua.ls Logo

WinGD X92 - Installation

Default Icon
574 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance33034/A1
Winterthur Gas & Diesel Ltd.
4/ 5
3. Installation
WARNING
Injury Hazard: The
connecting rod weighs
6000 kg. To prevent injury,
be careful when you move
the connecting rod.
WARNING
Injury Hazard: Before you
operate the turning gear,
make sure that no
personnel are near the
flywheel.
1) Clean the bearing shell (4, Fig. 7) on
the connecting rod and the crank pin
(2).
1) Clean the bearing shell (4, Fig. 7) on
the connecting rod and the crank pin
(2).
The procedure for installation of the
connecting rod is the same as for removel,
but in reverse.
2) Use the same tools as for removal
procedure.
3) Move the connecting rod (1) to front of
the column door.
4) Make sure deviation pipes 94117B and
94117C are installed.
5) Use the turning gear to turn the crank
pin 45° towards fuel side.
2015
Removal and Installation
Fig. 7
H3
94337
1
WCH03037
H4
2
1
3
94334A
5
H2
94319
94039057
94017047
94017045
94117B
94117C
94016015
(94334)
4

Table of Contents

Related product manuals