Maintenance
6606−1/A1
Winterthur Gas & Diesel Ltd.
1/ 8
Removal and Installation
Tools:
2 Trolley, 5000kg 94015F 1 Left Support 94663A
1 Manual ratchet, 800kg 94016−003 1 Right Support 94663B
2 Manual ratchet, 3200kg 94016-015 1 Support 94663L
1 Spur-geared chain block, 2500kg 94017−028 1 Ring, 5500kg 94666A
1 Shackle, 8500kg 94019L
1 Chain, 5300kg 94020A
6 Svivel lug 94048-M42
1. Preparation 1.......................................................
2. Removal (SAC at Free End ) 2.......................................
3. Removal (SAC at Driving End) 5.....................................
4. Installation (SAC at Driving End) 6...................................
5. Installation (SAC at Free End) 8......................................
6. Completion 8.......................................................
1. Preparation
1) Read the data in 0012−1 General
Guidelines for Lifting Tools.
2) Stop the engine.
3) Stop the cooling water pump.
4) Close the butterfly valves (7, Fig. 1).
5) Drain the water from the (SAC) (5).
6) Remove the drain pipes (3, 4).
7) Remove the vent pipes (1).
8) Remove the outlet pipe (6).
9) Remove the inlet pipe (2).
2015
Scavenge Air Cooler
Fig. 1
WCH02969
2
1
3
5
4
6
7