62Y3A11
1-36
1
2
3
4
5
6
7
8
I
Break-in
In the test run, the break-in operation is per-
formed in the following three stages.
1. One hour
a
at 2,000 r/min or at approxi-
mately half throttle.
2. One hour
b
at 3,000 r/min or 3/4 throttle
and one minute out of every ten at full
throttle.
3. Eight hours
c
at any speed, however,
avoid running at full speed for more than
five minutes.
È
Hour
After test run
1. Check for water in the gear oil.
2. Check for fuel leakage in the cowling.
3. After a test run and while the engine is at
idle, flush the cooling water passage with
fresh water using the flushing kit.
S62Y1580
0
1
210
Predelivery checks