EasyManuals Logo

Agilent Technologies agilent 7683B User Manual

Agilent Technologies agilent 7683B
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
68 Installation, Operation, and Maintenance
Part 1, Installation
2 Installation
Making A Trial Run
Once installation, configuration and updating are complete, make a quick
injection using the sampler to verify that it works properly.
1 Install an empty syringe in the injector.
2 If using a tray with a G2913A injector, install the 1-sample turret.
If using a tray with a G2613A injector, install the 3-sample turret.
3 Place empty bottles in all the Solvent A and Waste A turret positions. Place
an empty capped sample vial in the tray 1 position (or the turret sample 1
position, if not using the tray).
4 Make the sampler settings shown in Table 11. These are designed for a
6890N GC. If you are using a different GC, use these settings as a guide. To
enter the settings:
5890 Series II GC Use the G2911AA software.
For 6850 GC Use the handheld controller.
For 6890 GCs Use the GC keyboard.
Table 1 1 Trial run parameters
Parameter Setting
Injection volume 1
#Sample pumps 1
Viscosity delay 0
#Sample washes 1
#Solv A washes 1
#Solv B washes 0
Slow plunger Off
Pre-dwell time 0
Post-dwell time 0
Sampling offset Off
#Solv A pre-wash 1
#Solv B pre-wash 0
#Injections/vial 1
Samples 1–1
(for 6890 GC with tray and Agilent ChemStation
control, enter 1 in vial box and run method).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies agilent 7683B and is the answer not in the manual?

Agilent Technologies agilent 7683B Specifications

General IconGeneral
BrandAgilent Technologies
Modelagilent 7683B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals