EasyManua.ls Logo

Alstom Reason RPV311 - Monitoring

Alstom Reason RPV311
350 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RPV311
Chapter 5 Operation
RPV311-TM-EN-6
145
D SOE records listed, with the following information:
Time stamp: indicates the date and time of event log (yyyymm-dd hh:mm:ss[.uuuuuu] 0000 (UTC
time offset);
Cause: indicates threshold exceeded;
Duration: record length in seconds.
E The <COMTRADE> button allows download of record, line per line, and saving it in the Comtrade format,
and compression as .zic file.
F The <CLOSE> button allows user to close the section.
3.7 MONITORING
With the Web Interface it is possible to monitor the values related to circuits and channels in three different
ways: through Plots, Current and Voltage Circuits, and Digital Channels.
3.7.1 MEASUREMENTS
Voltage and Current Measurement:
The values listed below are computed at the nominal system frequency (50 or 60 Hz):
Voltage and current measurement

RMS value ²
RMS value (neutral) ²

Phasors ¹

Phasors (neutral) ¹
Positive sequence ¹ ²
Negative sequence ¹ ²
Imbalance ¹ ²
Fundamental frequency ²

Total harmonic distortion ²

Table of Contents