EasyManua.ls Logo

doble SFRA - Page 121

doble SFRA
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72A-2570-01 Rev. K 07/2011 Index-1
Index
A
About command, defined A-9
Added Temporary Static-Discharge Grounds
(screenshot) 3-13
Advanced Setup check box 3-21
Advanced Test Protocol section of Test Details
window 3-21
Analysis tab A-17
antivirus software 3-4
Apparatus Selection Window (screenshot) 3-8,
3-18
Apparatus tab A-19
autotransformer tests, setup B-3
auto-zoom of completed traces 3-10, 3-24
B
best practices for testing transformers 3-14
Blade in Top of Fuse Cover (screenshot) D-2
Browse for Folder Dialog Box (screenshot)
5-9
C
Cable and Lead Connections to the SFRA
Instrument (figure) 3-2
Cable Connections for Shorted-Lead Test
(figure) 3-9
Center Cursors command, defined A-7
clamps, plain copper, photo and part number
1-4
Clear Traces command, defined A-9
cloning a transformer 5-6
Command Window Displaying IP Address
(screenshot) 3-31
communication cables
Ethernet crossover with part number 1-4
USB with part number 1-4
Confirm Installation Window (screenshot) A-3
Connect to Instrument Message (screenshot)
3-3
Connected SFRA Leads (screenshot) 3-13
Connecting Safety Ground to Transformer
(figure) 2-2
consistent testing setup, importance of 3-14
correct shorted-lead response 3-11
Correct Shorted-Lead Response (screenshot)
3-11
CSV files for exported data 5-10
Cursor 1 command, defined A-7
Cursor 2 command, defined A-7
D
data
default storage locations for test results 5-8
managing 5-8
source files, selecting 5-9
transferring between M5300s or PCs 5-12
Data Manager tab 3-4, A-11
De-energized and Disconnected Transformer
(screenshot) 3-12
deleting traces 5-11
DNS suffix for IP address 3-31
Doble Engineering shipping address D-3

Table of Contents

doble SFRA - Page 121