5. The following is a guide to approximate expected good results.
a. The gradient (m) falls between 0.98 and 1.02.
b. The intercept (b) lies between -2 and +2.
c. The correlation (R
2
) is greater than 0.99.
6. If unsatisfactory results are observed refer to Section 7.
5.8 Flow Calibration (Internal Pump Option Only)
This procedure calibrates the rate of the flow generated by the internal pump. The following procedure
must be performed if the instrument:
After a service or repair.
When the external flow check has found the flow to be outside normal range.
When a new pump has been installed.
When the instrument is reset to factory defaults.
Equipment Required
Calibrated Flow Meter
Procedure
1. Disconnect any external tubing connected to the rear ports of the instrument (Sample Port,
Exhaust Port, etc.).
2. Open - Main Menu Calibration Menu Flow Calibration Menu.
3. Select - Pump Control MANUAL - Accept.