EasyManua.ls Logo

Ecotech Acoem Serinus 30 - Instrument Set-Up; Figure 36 - Installation of USB Memory Stick; Figure 37 - Travel Screw Locations; Figure 38 - Switching the Battery ON;OFF

Ecotech Acoem Serinus 30
225 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serinus® 30 User Manual 3.3
Page 46
2.3.4 Instrument Set-Up
1. Refer to Figure 36. Open the lid and make sure the USB memory stick is installed.
Figure 36 Installation of USB Memory Stick
2. Refer to Figure 37. Remove the travel screws from the measurement cell (store in a zip lock bag
within the analyser).
Figure 37 Travel Screw Locations
3. Refer to Figure 38. Check that the battery switch is turned ON at the main controller PCA.
Figure 38 Switching the Battery ON/OFF

Table of Contents

Related product manuals