F9, F9 Express Fetal & Maternal Monitor User Manual Introducing the FTS-3 Fetal Telemetry
System
- 43 -
NOTE:
1 If a rechargeable battery is outfitted, charge it fully each time after using the device to
ensure the electric power is enough.
2 When the battery configuration is provided, after the device is transported or stored,
the battery must be charged.
3.2.3 Installing the System
FTS-3 should be placed on a flat surface. It should be placed far from the device with strong
radiation and avoid being in the shielded room. If there are 3 similar systems, they should be kept
at a distance of over 1.5m from each other.
Alternatively, provided with proper devices, it can be installed on a wall or a trolley. Consult the
sales representative for more information.
CAUTION
1. Installation must be carried out by qualified personnel authorized by the
manufacturer.
2. If you choose to install FTS-3 on the wall, MT-803 trolley, MT-503 trolley or other
locations, it is the user’s responsibility to ensure their integrity and solidity evaluated
by a registered, professional structural or mechanical engineer and compliance with
all local regulations. The manufacturer will not be responsible for the failure and loss
of any improper installation.
3.2.4 Connecting Power Cable
Make sure the AC power supply of the system complies with the following specification:
100V-240V~, 50Hz/60Hz.
The equipotential grounding terminal is provided for the connection of a potential
equalization conductor. Therefore, it is recommended to connect the grounding terminal of
the system and the power outlet with the grounding wire, making sure FTS-3 is grounded.
WARNING
If the protective grounding (protective earth) system is doubtful, the power of the system
must be supplied by internal power supply only.
NOTE:
1 Make sure the system and the power outlet are placed at a place where it is easy to
connect and disconnect the power cord.