Installation
INSTALLATION
Checking the installation
8.
Ref.2003
· 301 ·
QC-PDS
HARDWARE
8.7 Checking the installation
Check the installation made:
Mechanical fixings of the entire system.
Distances.
Tightening all screws with the corresponding torque.
Electrical connections and cabling.
Connection of protection conductors.
Fuses, value and type.
Ends of the cable conductors.
Properly installed cables and connectors.
Mechanical locks of the connectors.
Control cables.
Shielded connections required under the EMC Directive.
Compliance with the EMC Directive.
Electrical cabinet covers and seals satisfactory installed in order to
achieve the degree of protection required.