6.7  CC-Link Interface Card 
6-187 
Chap. 6 
CONTROL OPTIONS 
6.7.14 Setting-up procedure 
The following flow shows the initial setting-up procedure for the CC-Link option, using the procedure 
given in this chapter. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Now the inverter is ready to run via CC-Link. 
After the CC-Link master becomes ready, run the master to operate the inverter via CC-Link. 
 
 
6.7.15  Application program examples 
6.7.15.1 System configuration 
PLC
Power 
supply
Q61P-A1
CPU
Q02CPU
CC-Link 
master unit
QJ61BT11N
X00 - X1F
Y00 - Y1F
Input unit
QX40
X20-X2F
VG1
Station address 1
OPC-VG1-CCL
VG7S
Station address 2
OPC-VG7-CCL
* Installation of termination register 
between DA and DB in the master unit
X20
* Installation of termination register 
between DA and DB in the master unit
CC-Link dedicated cable
 
Figure 6.7.19    System Configuration 
 
6.7.15.2  Master unit outline 
This section outlines the CC-Link master unit necessary for execution of application program examples. For 
details, refer to Mitsubishi Electric CC-Link System Master Local Unit user's manual (volume on details). 
 
Acceptance inspection 
Mount option 
Connect cables 
Set the switches (RSW1 to 3) 
Turn ON the inverter power 
Configure function codes H29, H30, o30 to o32 
Start 
Preparation completed