6.7 CC-Link Interface Card
6-187
Chap. 6
CONTROL OPTIONS
6.7.14 Setting-up procedure
The following flow shows the initial setting-up procedure for the CC-Link option, using the procedure
given in this chapter.
Now the inverter is ready to run via CC-Link.
After the CC-Link master becomes ready, run the master to operate the inverter via CC-Link.
6.7.15 Application program examples
6.7.15.1 System configuration
PLC
Power
supply
Q61P-A1
CPU
Q02CPU
CC-Link
master unit
QJ61BT11N
X00 - X1F
Y00 - Y1F
Input unit
QX40
X20-X2F
VG1
Station address 1
OPC-VG1-CCL
VG7S
Station address 2
OPC-VG7-CCL
* Installation of termination register
between DA and DB in the master unit
X20
* Installation of termination register
between DA and DB in the master unit
CC-Link dedicated cable
Figure 6.7.19 System Configuration
6.7.15.2 Master unit outline
This section outlines the CC-Link master unit necessary for execution of application program examples. For
details, refer to Mitsubishi Electric CC-Link System Master Local Unit user's manual (volume on details).
Acceptance inspection
Mount option
Connect cables
Set the switches (RSW1 to 3)
Turn ON the inverter power
Configure function codes H29, H30, o30 to o32
Start
Preparation completed