GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card TSG A015 - Lift Movement Troubleshooting
Page no. 1055 Chapter 9
JC-TSG-A-015.fm
the Rotation board, use a 6 mm socket wrench with universal joint (knuckle joint).
11. Once the Arm has been disconnected from the Cardan Nut Assembly, lift the exam Arm by hand
manually so that the detector upper surface is approximately 1 meter above the floor.
If you need lots of force to manually lift the Arm up, do not try to lift the Arm as the Lift Gas Spring is
faulty. In this case, just change the Lift Gas Spring according to Job Card D/R A206A - Lift Gas
Spring on page 1183.
7
Universal joint
(knuckle joint)