GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Cable Lay-out and Pin-out
Page no. 303 Chapter 3
Cables.FM
1-21. W120 - Serial Link RX Generator from Interface Board
Generator Interface J6 to Interface Board PL104 J10.
1-22. W121 - Grid Sync Generator to Interface Board
Interface Board PL104 J8 to Generator (Grid sync.) J19.
1-23. W123 - Terminal Block Interconnection
Terminal block ST102 from B/1 to P’.
1-24. W124 - AC Supply to Gantry
Generator J7 to Terminal 1 ST101-3.
1-25. W125 - 12 V DC Supply to PDU Board and Generator Shutdown Signal
PDU Board PL101 J2 to Generator.
If the error 152/001
12VDC Generator voltage off occurs, there may be an issue with the W125 Cable, PDU
Board, or the Generator Supply Command board. For more information, refer to JC DIAG A1501 12V DC Genera-
tor Voltage Off
on page 971.
Pin no. on
PL101
Functions Location on Generator
PL 101 J2-1 HV Supply shutdown signal Orange coupling block (which leads to
TB1-1)
PL 101 J2-2 HV Supply shutdown signal Orange coupling block (which leads to
TB1-2)
PL 101 J2-3 12 V DC PDU Board supply from Generator TP10 connector on
Supply Command Board 200PL2
PL 101 J2-4 GND Top left ground bolt on
Supply Command Board 200PL2