8 - Centralized Conguration Manager(CCM) Software
86 / 112
000HZ6006EN.US • 02 • GEM Hemochron 100 Operator Manual
87 / 112
000HZ6006EN.US • 02 • GEM Hemochron 100 Operator Manual
EQCSettings Dialog Box:
Figure 91
: CCM – EQC Settings Dialog Box
Table 16: CCM – Instrument Settings > EQC Settings
Setting Description
EQC Lockout Control
EQC Required Choose whether to require (Yes) or not require (No) the QC lockout feature associated
with EQC tests. See
“QC Lockout” (page 53)
.
• Yes – EQC is required.
• No – EQC is not required.
CAUTION: If the EQC test feature is required (Yes), the instrument will be required to
perform validation testing at regular intervals. The factory default setting for this feature
is required (Yes) but can be changed using CCM. The manufacturer recommends that it
be required (Yes). The decision to require (Yes) or not require (No) this feature shall be
determined by and is the responsibility of the each institution.
When QC lockout occurs, a
Supervisor
must clear the lockout before an
Operator
can
run a test.
Auto EQC Choose whether to automatically run the EQC test at the specied interval:
• No – Do not automatically run the EQC test at the specied interval.
• Yes – Automatically run the EQC test at the specied interval.
NOTE: When the EQC Interval expires, the EQC test will automatically start, and the
test result will automatically be stored in the database. EQC will automatically start even
if power is not connected.
NOTE: If Auto EQC is enabled, ensure test cartridges are routinely removed from the
instrument after a test. If a test cartridge is in the test cartridge insertion chamber when
the EQC test starts, a warning message will be displayed and the test will not run.
Interval If EQC is required (default):
• Fixed Time Schedule – The EQC is required to run at a specied time. Factory
default value is xed (e.g.,
Congured time: 9 am, interval 8 hr. User start EQC at
8 am, next EQC will be required to run at 9 am [same day]
).
• Rolling – The EQC test will be run at a specied interval. The start time will be based
on the start time of the last successful EQC test (e.g.,
Congured time: 9 am, interval
8 hr. User start EQC at 8 am, next EQC will be required to run at 4 pm
).