EasyManua.ls Logo

Hillrom PST 300+ - Page 64

Hillrom PST 300+
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Column electric components
64
4990851_002_00 – 2082262 – 2022-01-10
4. If all work on the lift is complete, fasten the cover plate [3] to
the spindle end (securing ring pliers and omniFIT 100M thread
locking agent).
5. Attach the underbody cover on the running gear (7 screws).
6. Glue a new protective sheet over the bearing housing of the
spindle.
7. Restore the operating table to the upright position
(Chapter 6.8).
8. Put the pad in place.
9. Connect the power supply to the operating table
(Chapter 6.2).
10. Update the firmware of the operating table.

Table of Contents

Related product manuals