Page 36 SLG 700 SmartLine Level Transmitter User’s Manual Revision 8
3 Transmitter Installation
3.1 Preparation
Installation sequence
Table 3-1 lists the overall installation steps. Details are provided in the indicated sections.
Table 3-1: Installation sequence
Step
Action
See
Section
1
Perform mechanical installation of transmitter and probe.
3.2
2
Connect transmitter wiring and power.
3.3
After Installation check the transmitter’s configuration and tune if necessary. Transmitters
that were ordered using Honeywell’s SmartLine Application and Validation Tool (AVT) will
come with parameters pre-loaded so that the transmitter will give accurate level
measurements out-of-the-box. Refer to SLG 700 HART Option Manual, #34-SL-25-06 or the
SLG 700 FOUNDATION Fieldbus manual, #34-SL-25-07.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell SmartLine SLG 700 and is the answer not in the manual?

Honeywell SmartLine SLG 700 Specifications

General IconGeneral
BrandHoneywell
ModelSmartLine SLG 700
CategoryTransmitter
LanguageEnglish

Related product manuals