EasyManuals Logo

HP P2000 G3 Cli Reference Guide

HP P2000 G3
532 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
58 Alphabetical list of commands
Create schedule Sched2 that runs Task2 for the first time on March 1, 2012, and on the first
weekday of each month, with no expiration:
# create schedule schedule-specification "start 2012-03-01 00:01 only first
weekday of month" task-name Task2 Sched2
Success: Command completed successfully. (Sched2) - The schedule was created.
(2012-01-20 15:46:16)
Try to create Sched3 with a start time outside the “betweenrange:
# create schedule schedule-specification "start 2012-01-14 4:15 PM between 12:00
AM and 12:00 PM" task-name Task3 Sched3
Error: create schedule: (Sched3) - The specified start time must be within the
range specified with the 'between' parameter. (2012-01-20 15:46:08)
See also show schedule-details
show schedules
show task-details
show tasks

Table of Contents

Other manuals for HP P2000 G3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP P2000 G3 and is the answer not in the manual?

HP P2000 G3 Specifications

General IconGeneral
ModelP2000 G3
CategoryStorage
Drive SupportSAS, SATA
Host InterfaceiSCSI, Fibre Channel, SAS
Form Factor2U
RAID Levels0, 1, 5, 6, 10
Cache2 GB
Drive Bays12 (SFF), 24 (SFF), 12 (LFF)
Cache Memory2GB per controller
Operating Temperature10°C to 35°C
Power SupplyRedundant
Expansion OptionsDisk Enclosures

Related product manuals