Table 6-5 Commissioning checklist
Check Item Actual Result
No oil stain exists on the copper pipe thermal insulation
foam or bottom plate, or it has been cleaned.
□ Passed □ Failed
The needle valve plug is secured (torque of 0.45±0.05 N
m), and valve bonnet is tightened.
□ Passed □ Failed
The foreign matter inside the water pan and bottom plate
is cleaned up.
□ Passed □ Failed
The air lter is correctly installed according to the air ow
direction on the frame.
□ Passed □ Failed
NetCol8000-A(045, 055, 060, 090, 120) In-room Air
Cooled Smart Cooling Product
User Manual 6 Power-On Commissioning
Issue 05 (2020-10-10) Copyright © Huawei Technologies Co., Ltd. 203